Energy, Project Development & Finance

Practice Contacts
Jerry Bloom
T: +1 (213) 615-1756 | Email
Practice Areas
Energy, Project Development & Finance
Energy Regulatory-FERC
Energy Regulatory-NRC
Energy Industry Transactions
Energy Industry Investigations and Litigation
Energy Project Development
Renewable Energy
West Coast Energy Regulatory
Resource Center
Topics
Atomic Energy Act   backfit   Clean Air Act   coal-fired generation   combined license   DALRP   DOE   electric markets   energy efficiency   energy markets   EPA   Federal Power Act   FERC   FFT   fracking   fuel storage   gas-fired generation   gen-tie   greenhouse gas emissions   hydropower   incentive rate rules   interconnection   MISO   natural gas   nuclear power plant   Nuclear Regulatory Commission   offshore wind energy   public utilities   PURPA   renewable energy   solar   steam generator   waste disposal  
Other Winston & Strawn Blogs
ENERGY INDUSTRY WATCH

Welcome to Winston & Strawn’s Energy Industry Watch, a blog dedicated to providing legal and policy analysis in the energy industry, drawing on the depth of our attorneys’ knowledge base.

We expect Energy Industry Watch will become your dedicated resource for energy industry updates and developments.

To subscribe to this Watch, please click the RSS icon at the top right of the page or contact one of the bloggers to be added to our blog mailing list.
About the Bloggers
Blog Tools Recent Postings | All Postings | Power Search | Attorney Login
April 23, 2013 icon
FERC Order Conditionally Approved California ISO’s Order No. 1000 Compliance Filing

In an order issued April 18, 2013, the Federal Energy Regulatory Commission ("FERC") conditionally approved the Order No. 1000 compliance filing submitted by the California Independent System Operator Corporation ("CAISO") addressing local and regional transmission planning and cost allocation processes set forth in the CAISO Open Access Transmission Tariff. FERC required CAISO to submit a further compliance filing within 120 days of the order to address certain further tariff modificati . . .

Roxane E. Maywalt ; Raymond B. Wuslich

Read More Email comments to the authors
April 22, 2013 icon
FERC Acted on Four Order No. 1000 Compliance Filings

In orders issued April 18 and 19, 2013, the Federal Energy Regulatory Commission acted upon four filings made in response to its directives in Order No. 1000. The linked memorandum summarizes the Commission's rulings on the Order No. 1000 compliance filings by NorthWestern Corporation and South Carolina Electric & Gas Company, in which the Commission directed further compliance by each utility. Also summarized are the Commission's grant of requests for waiver from compliance with Ord . . .

Roxane E. Maywalt ; Raymond B. Wuslich; Victoria L Hsia

Read More Email comments to the authors
April 22, 2013 icon
FERC Issued Order No. 773-A on Rehearing and Clarification of NERC Bulk Electric System Definition and Exceptions Process Under Rules of Procedure

In its Order No. 773-A, issued April 18, 2013, the Federal Energy Regulatory Commission denied in part and granted in part requests for rehearing, and made certain clarifications, of its December 20, 2012 Order No. 773 in which it approved the revised definition of "Bulk Electric System" as developed by the North American Electric Reliability Corporation ("NERC"), for determining which facilities or elements are subject to NERC's Reliability Standards. Order No. 773-A also responded to c . . .

Roxane E. Maywalt ; Raymond B. Wuslich

Read More Email comments to the authors
April 19, 2013 icon
FERC Issues Order Clarifying Certain Electric Quarterly Report Requirements

On April 18, 2013, the Federal Energy Regulatory Commission ("FERC") issued an order on rehearing and clarification of its September 2012 Final Rule ("Order No. 768") under which it required non-public utilities that have more than a de minimis market presence to file Electric Quarterly Reports ("EQR") and revising certain EQR filing requirements applicable to both public and non-public utility market participants in the interstate wholesale electric markets. In the April 18 order, F . . .

Roxane E. Maywalt ; Raymond B. Wuslich

Read More Email comments to the authors
April 19, 2013 icon
FERC Issues Notice of Proposed Rulemaking on Generator Requirements at the Transmission Interface, Docket No. RM12-16-000

On April 18, 2013, the Federal Energy Regulatory Commission ("FERC") issued a Notice of Proposed Rulemaking proposing to adopt modifications to four existing Reliability Standards as submitted by the North American Electric Reliability Corporation ("NERC"). FERC proposes to approve revised Reliability Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection Syste . . .

Roxane E. Maywalt ; Raymond B. Wuslich

Read More Email comments to the authors