Energy, Project Development & Finance

RSS Feed Email Print
Share
View divider Overview divider Attorneys divider Matters divider a-energyblog.gif divider PDF Version
Practice Contacts
Jerry Bloom
T: +1 (213) 615-1756 | Email
Practice Areas
Energy, Project Development & Finance
Energy Regulatory-FERC
Energy Regulatory-NRC
Energy Industry Transactions
Energy Industry Investigations and Litigation
Energy Project Development
Renewable Energy
West Coast Energy Regulatory
Resource Center
Topics
Atomic Energy Act   backfit   Clean Air Act   coal-fired generation   combined license   DALRP   DOE   electric markets   energy efficiency   energy markets   EPA   Federal Power Act   FERC   FFT   fracking   fuel storage   gas-fired generation   gen-tie   greenhouse gas emissions   hydropower   incentive rate rules   interconnection   MISO   natural gas   nuclear power plant   Nuclear Regulatory Commission   offshore wind energy   public utilities   PURPA   renewable energy   solar   steam generator   waste disposal  
Other Winston & Strawn Blogs
ENERGY INDUSTRY WATCH

Welcome to Winston & Strawn’s Energy Industry Watch, a blog dedicated to providing legal and policy analysis in the energy industry, drawing on the depth of our attorneys’ knowledge base.

We expect Energy Industry Watch will become your dedicated resource for energy industry updates and developments.

To subscribe to this Watch, please click the RSS icon at the top right of the page or contact one of the bloggers to be added to our blog mailing list.
About the Bloggers
Blog Tools Recent Postings | All Postings | Power Search | Attorney Login
May 7, 2012
Extension of Time for NERC to Revise the Reliability Standard on Frequency Response

On May 4, 2012, FERC issued an order responding to the North American Electric Reliability Corporation’s (“NERC”) motion for an extension of time to submit a revised Reliability Standard BAL-003 (Frequency Response and Bias) in compliance with earlier FERC directives. NERC had requested an indefinite extension beginning with two additional technical conferences to be followed by a proposed schedule. After pointing out that NERC had already been granted an extension from the original deadline of September 2010 to May 2012, FERC allowed a second extension for one year. In the interim, NERC was directed to file quarterly status reports and to complete the proposed statistical analysis and additional research into the calculation of the frequency response obligation within six months.

The current BAL-003 was approved in 2007, and since 2007 FERC has called for the standard to be modified to (1) define the necessary amount of frequency response needed for reliable operation for each balancing authority, and (2) identify methods of obtaining the frequency response and measuring that the necessary amount is achieved. NERC has stated that such modifications involve highly technical issues and necessitate conducting new studies.


Topics
FERC

Raymond B. Wuslich
Email comments to the author